Login  |  Register

Insert Pull Rod Crane For Aac Panel

For the completion of mesh cage insertion and brazing operations; The assembled, anticorrosive and dried assembly frames are hoisted and placed in the pouring mold box, and the resting assembly frames are pulled out of the mold box and hoisted to the return position of the frame cycle.

Alexa Traffic